Sign In | Join Free | My xpshou.com
China Xi'an Brictec Engineering Co., Ltd. logo
Xi'an Brictec Engineering Co., Ltd.
Xi'an Brictec Engineering Co., Ltd.
Verified Supplier

1 Years

Home > Clay Brick Production Line >

Dryer Machine in Brick Making Process and Products in Drying Chamber in Malaysia

Xi'an Brictec Engineering Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Dryer Machine in Brick Making Process and Products in Drying Chamber in Malaysia

Brand Name : Brictec

Place of Origin : China

Payment Terms : L/C, T/T,

Certification : CE/SGS/ISO9001

Packaging Details : clay brick making machine by container sea shipment

Automatic : Yes

Project : Malaysia CBT

Work : Automatic working

Color : Customized

Type : Clay Brick machine

Brick Factory Processing : single layer dryer +tunnel kiln

Main Market : All over the world

Equipment : Fan, belt conveyor,kiln cart

Production C : Customized

Suitable Bricks : hollow blocks , tiles

Suitable For Bricks : soild/hollow blocks

Firing System : Gas, Heavy oil, Pulverized coal

Material : clay , fly ash , mud, soil ,coal

After-Sales Service : Online Support/Field Maintenance and Repair Service/Overseas Service

Contact Now

Dryer Machine in Brick Making Process and Products in Drying Chamber in MalaysiaDryer Machine in Brick Making Process and Products in Drying Chamber in Malaysia

1.Drying Chamber Section

1:The cyclone base and main shaft motor on the top of the drying chamber have been installed,22 cyclone cone barrels have been installed and debugged,and 65 fans have been installed;

2:The hot air pipe was produced on November 25,and the welding and assembly were completed;

3:The concrete pouring of 2 out of 4 lines of the internal track of the drying chamber has been completed,and the other 2 lines are expected to be completed before December 8;

4:The ferry lane construction at the vehicle exit has been completed;

5:The hot air feeding blowers have been moved to the installation location;

6:65 cyclone column piers have been poured.

2.Tunnel Kiln Section

1:After the completion of the ceiling beams,85 beams have been installed,along with 1512 secondary beams;

2:The concrete pouring for the tunnel kiln ring beam has been finished;

3:The construction of 2 return lines in the pre-drying chamber has been completed;

4:The foundation construction of the ferry lane at the exit has been completed,and the steel bars of the track beam have been tied,awaiting track installation;

5:The concrete pouring of the moisture exhaust chamber at the entry has been completed, and the case-in-place concrete top plate at the exit has also been completed;

6:The ground of the return line has been excavated,and the crusher will be brought in next week to crush the ground,after which construction will commence;

7:3780 lightweight high-aluminum hanging bricks and 3780 MG-26 polylight mullite ceiling bricks have been bonded.


Product Tags:

Brick Making Process Dryer

      

Brick Making Process Drying Chamber

      

Brick Making Process Dryer Machine

      
China Dryer Machine in Brick Making Process and Products in Drying Chamber in Malaysia wholesale

Dryer Machine in Brick Making Process and Products in Drying Chamber in Malaysia Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Xi'an Brictec Engineering Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)